Enel Green Power Lotto 1

Enel Green Power Lotto 1

  Lotto 1: UT Lucca/UT Bologna -12 sbarramenti, Italy  Suviana h= 89 m, Vagli h=88 m Verification of seismic vulnerability and executive design  Enel Green Power     2019- In progress Verification of the seismic vulnerability of dam works considered “Large...
Enel Green Power Lotto 2

Enel Green Power Lotto 2

 Lotto 2: UT Tivoli/UT Montorio/UT Presenzano – 11 Sbarramenti, Italy   Cesima h= 45 m, Gallo h=20 m   Verification of seismic vulnerability and executive design of anti-seismic adaptation interventions Dams    Enel Green Power     2019 – In progress...
Enel Green Power Lotto 3

Enel Green Power Lotto 3

 Lotto 3: UT Ascoli/UT Catania – 10 sbarramenti, Italy   Piana degli Albanesi h =38 m, Borgiano h= 27 m   Verification of seismic vulnerability and executive design      Enel Green Power     2019 – In progress Verification of the seismic vulnerability of dam...
ASEA – Agenzia Sannita Energia Ambiente

ASEA – Agenzia Sannita Energia Ambiente

 Campolattaro (BN), Italy    M Verification of seismic vulnerability  ASEA – Agenzia Sannita Energia Ambiente   2021 – In progress Engineering services for the seismic re-evaluation of the Campolattaro dam, of the related complementary and ancillary works...
Enel works barriers

Enel works barriers

Barriers in Italy     (including: Roccasparvera  h= 26 m, Lago Vannino h=24 m)  Verification of seismic vulnerability    Enel Green Power     2021 – In progress Verification of the seismic vulnerability of dam works considered “Large Dams” and of the...